Due to duration of planning and execution of construction contracts and physical extensiveness of works:
Other features of construction contracts include:
The above are to cater for following aspects of construction contracts:
To ensure that parties’ rights are safeguarded construction contracts have standard features:
4.1 Power to instruct variations
In the case of construction contracts
4.1.2 Valuation of variations
IEM Form provides at Clause 52 that rates:
The PAM Form additionally allows valuation on a cost plus 15% basis which is to include use of temporary facilities, site establishment as well as profit
4.2.1 Power to extend time for completion
4.2.2 Common grounds for extension of time (“EOT”) –
below follow PAM Form 23.8:
4.2.3 Notice of delay and application for extension of time
4.4 Performance security
4.4.1 Grounds to resist liquidation of bond:
4.6 Insurances
The fundamentals
4.6.1 Damage to the Works, damage to 3rd Parties
Construction All Risks insurance excludes:
4.7 Some provisions on payments are highlighted:
4.8 Termination generally